Solution
Pre-Engineered Metal Building Estimating Software
A metal building bid starts with the package from the manufacturer, then everything around it: the foundation, the erection, the insulation, the doors and openings, the canopies. The package price is only part of the number. Metal building estimating software should price the package and the rest together.
What makes metal building estimating genuinely different
The package is priced by floor area and size: small, medium and large, or a sample building at a stated size. Around it are primary and secondary framing, roof and wall panels with trim, insulation and vapor barrier, doors, windows and openings, canopies and overhangs, and erection labor. Foundations sit outside the package and belong on the bid.
Why generic estimating software falls short here
A general tool prices the building as one lump. The erection, openings and foundation get left out.
What PoPs Estimating actually gives you
A real catalog organized around the building:
- Building packages by floor area: small (up to 2,000 square feet), medium (2,000 to 6,000) and large (6,000 to 12,000), priced per square foot of floor.
- Sample buildings: three standard sizes, insulated or not.
- Component sections: primary and secondary framing, roof and wall panels and trim, insulation and vapor barrier, doors, windows and openings, canopies and overhangs, erection labor and foundations.
Takeoff happens directly on the drawing (Count, Linear Feet, Square Feet) and feeds a Bid Summary with real markup control. The catalog is ready for your labor units: enter your own production rates and your bids carry your labor, not an average from someone else's table. When the job is won, the estimate hands off to PoPs Project Tracker as the starting budget.
Where this fits
Metal buildings sit beside Structural Steel, Concrete and Masonry and Insulation. Construction Bid Manager runs the pipeline around the bid.
What it costs
PoPs Estimating is included in the Starter plan at $49 a month, where you pick PoPs Estimating or Construction Bid Manager, and in the Pro and Enterprise plans. Pricing is per plan, not per seat, so adding an estimator does not raise the price. The free trial runs 14 days with no credit card. See the full pricing page.
Who this is for
- Estimators & Subs — Bidding metal building packages and erection.
- General Contractors — Checking a metal building sub's bid.
FAQ
Is the package priced by floor area?
Yes, in three size bands, plus sample buildings.
Does it cover erection, foundations and openings?
Those are their own sections in the catalog.
Does the software include labor hours for erection?
The catalog is ready for your labor units: enter your own production rates and your bids carry your labor, not an average from someone else's table.
Is it as deep as the electrical catalog?
Electrical is the deepest trade in the system today, with over 36,000 items in Division 26. Metal buildings has about 170 items. Depth grows trade by trade.
What happens to an estimate once the job is won?
It hands off to PoPs Project Tracker as the starting budget, with nothing re-typed.