Underground Utilities Estimating Software
Underground work is priced by the foot of pipe, but the foot includes the trench, the bedding, the tracer wire, the backfill and the testing. Then come the fittings with their thrust blocks, the valves, the hydrants, the taps and the services. Underground estimating software should price the run with its parts, and each fitting as the item it is.
What makes underground estimating genuinely different
Pipe type and size set the price: PVC C900, ductile iron and HDPE for water at several sizes, sanitary sewer and storm pipe with structures, site gas and electrical conduit. Directional boring replaces trenching where the ground or the road requires it. Water main work adds bends, tees, gate valves with boxes, tapping sleeves, hydrants and blow-offs. And proof of work counts: pipe proving with a mandrel and post-install testing.
Why generic estimating software falls short here
A general tool prices utilities as pipe by the foot. The trench, fittings, structures and testing are added by hand.
What PoPs Estimating actually gives you
A real item-level catalog with complete assemblies built from it:
- Water: PVC C900 mains in 4 to 12 inch, ductile iron in 6 to 12 inch, HDPE pipe, bends and tees with restraint and thrust blocks, gate valves with boxes, tapping sleeves and valves, hydrant assemblies, blow-offs, air release valves, services and backflow assemblies.
- Sewer and storm: sanitary sewer pipe, structures and force mains, storm drainage pipe and structures, building drains to the sewer or septic.
- Gas and electrical: site gas piping, site electrical and communication conduit.
- Trenchless: directional boring and trenchless items.
- Trench materials and testing: markers, tracer wire and tape, and pipe proving by mandrel with post-install testing.
Takeoff happens directly on the drawing (Count, Linear Feet, Square Feet) and feeds a Bid Summary with real markup control. The catalog is ready for your labor units: enter your own production rates and your bids carry your labor, not an average from someone else's table. When the job is won, the estimate hands off to PoPs Project Tracker as the starting budget.
Where this fits
Underground utilities sit beside Excavation and Grading, Plumbing and Paving. Construction Bid Manager runs the pipeline around the bid.
What it costs
PoPs Estimating is included in the Starter plan at $49 a month, where you pick PoPs Estimating or Construction Bid Manager, and in the Pro and Enterprise plans. Pricing is per plan, not per seat, so adding an estimator does not raise the price. The free trial runs 14 days with no credit card. See the full pricing page.
Who this is for
- Estimators & Subs — Bidding site utilities.
- General Contractors — Checking a utility sub's bid.
FAQ
Is the trench included in the pipe price?
The pipe-run assemblies include trench, bedding, tracer wire and tape.
Does it cover fittings, valves and hydrants?
Yes, each as its own assembly with thrust blocks or valve boxes.
Does it cover directional boring?
Yes, trenchless items are in the catalog.
Does the software include labor hours for underground work?
The catalog is ready for your labor units: enter your own production rates and your bids carry your labor, not an average from someone else's table.
Is it as deep as the electrical catalog?
Electrical is the deepest trade in the system today, with over 36,000 items in Division 26. Underground utilities has nearly 400 items and its own assemblies on the same structure. Depth grows trade by trade.
What happens to an estimate once the job is won?
It hands off to PoPs Project Tracker as the starting budget, with nothing re-typed.